Laserfiche WebLink
t <br />AV& <br />amec <br />Earth & Environmental <br />D. Cut to Fill <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• No Activities <br />E. Subgrade Preparation <br />1. LOB Pad <br />• No Activities <br />F. SLF Processing (Material is being generated/processed for the LOB and the VLF) <br />• Ames finished setting up the clay plant (see attached photo) and processing <br />began this week. Two samples of unprocessed clay (SLF-1-C and SLF-2-C) <br />and one sample of processed clay (SLF-3-C) were collected this week for <br />laboratory testing. <br />G. Miscellaneous <br />1. Finished installation of erosion control silt fences below the LOB Haul Road. <br />II. Underground Working <br />A. Drilling <br /> • No Activities <br />B. Mine Shaft/Stope Remediation <br /> • No Activities <br />C. Lateral/Slot Remediation <br /> • No Activities <br />III. Storm water Management Structures <br />A. LOB Stormwater Culverts <br /> • No Activities <br />B. Roadside ditch <br /> • No Activities <br />C. Best Management Practices (BMPs) <br /> • No Activities <br />IV. LOB Geosynthetics <br />A. LLDPE Geomembrane <br /> • No Activities <br />Sheet 2 of 7 LOB Weekly Report WE 1.31.09.doc