amec <br />Earth $ Environmental <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co. Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ LOB <br />Date: 02/03/09 Reporting Period: 01/25/09 through 01/31/09 <br />Days S M T W T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Lows: 2° to 16° Highs: 13° to 51° <br />AMEC CQA Personnel On-site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1. EARTHWORKS <br />A. Clear and Grubbing <br />1. LOB Pad <br />• The majority of the LOB pad was cleared and grubbed on January 28, 2009. <br />2. LOB Delivery Road <br />• Contractor continued with construction of temporary access roads this week. <br />• Continued to clear and grub the haul road this week. The slash was hauled <br />to the Joe Dandy slash stockpile. <br />B. Stripping <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• Continued to strip haul road ROW. Topsoil that was removed was being <br />hauled to the upper topsoil stockpile north of the five-point intersection (see <br />attached photos). <br />C. Waste Rock to Stockpile <br />• No Activities <br />1. LOB Pad <br />• No Activities <br />2. LOB Delivery Road <br />• No Activities <br />Sheet 1 of 7 LOB Weekly Report WE 1.31.09.doc