Colowyo C-1981-019 <br /> 19 February 2009 <br /> Pg 2/4 <br /> Hydrologic Balance (cont.): - The Gossard Pond (NPDES 003A) was not inspected. <br /> - The West Pit Pond (NPDES 008A) was not inspected. <br /> - The Rail Loop Pond (NPDES 006A) was not inspected. <br /> - The Stoker Siding Pond (NPDES 005A) was not inspected due to the snow. <br /> - The East Taylor Pond (NPDES 01 OA) contained a small amount of water (to the <br /> bottom of the gated valve on the bottom of the riser pipe and 7 feet below the top <br /> of the discharge pipe) at the time of the inspection and was not discharging. The <br /> pond embankment was well vegetated and appeared to be stable at the time of <br /> the inspection. No erosional problems noted on the embankment at the time of the <br /> inspection. <br /> - The Prospect Pond (NPDES 007A) contained a small amount of water but was not <br /> discharging at the time of the inspection. The pond embankment was covered with <br /> snow but appeared to be stable at the time of the inspection. There were no <br /> erosional problems noted on the pond embankment. The operator has completed <br /> the cleaning of the pond, as required. Although there was a small amount of water <br /> in the pond, it appears as though the operator has done a thorough job cleaning the <br /> pond. In addition to cleaning the pond, the operator also replaced some riprap at <br /> the inlet of the pond and armored a portion of the inslope of the pond at the inlet <br /> side. The completion of this work will result in the Division terminating Notice of <br /> Violation CV-2008-004. Please see the pictures at the end of this report. <br /> - The Gulch A Pond (NPDES 004A) appeared to be dry at the time of the inspection <br /> (although the bottom of the pond was covered with snow, so there may have been <br /> a small amount of water in the pond). The pond embankment was covered with a <br /> few inches of snow but appeared to be well vegetated and stable at the time of the <br /> inspection. There were no erosional problems noted on the pond embankment at <br /> the time of the inspection. <br /> - The Section 16 Pond (NPDES 009) was inaccessible and not inspected (and will <br /> probably remain inaccessible until late spring. <br /> - The Streeter Pond (NPDES 001 A) contained water approximately one foot below the <br /> top of the discharge pipe and was discharging a small amount out of the weep hole. <br /> The pond embankment was covered with a few inches of snow but appeared to be <br /> well vegetated and stable at the time of the inspection. There were no erosional <br /> problems noted on the pond embankment at the time of the inspection. The Streeter <br /> Pond was recently cleaned (following the cleaning of the Prospect Pond). The <br /> operator did a good job cleaning the inlet and presettling areas of the pond. - The <br /> Section 28 Pond (NPDES 012A) was not inspected because of the snow cover on the <br /> Sturgeon road. <br /> - Sump 1 was not inspected. <br /> - Sump 2 was full but was not discharging at the time of the inspection. The sump <br /> was stable at the time of the inspection. <br /> - Sump 3 was full but was not discharging at the time of the inspection. The sump <br /> was stable at the time of the inspection. <br />