Laserfiche WebLink
Geotechnicai Evaluation of Mine-Induced Earthquakes on Bruce Park Dam <br />Bowie Resources, Limped <br />June 2002 <br />Section 6 -Recommendations <br />Based on the results of the evaluations performed and documented in this report, we <br />reconunend the following: <br />Data should be collected from the piezometers and inclinometers in the existing <br />landslide at least three times each year. The data collection should be in the spring as <br />soon as the snow melts and access to the instruments is available, in July or August <br />and in late October or early November before the snow restricts access to the area. <br />2. The collected data should be tabulated and plotted on a continuous time scale so that <br />changes in water levels and movement, if any, of the landslide can be easily <br />identified. The data collection should be performed and reviewed by a Colorado <br />registered Professional Engineer who has experience with dams, landslides, and <br />seismicity. <br />Q2-0~ 3: GeattshnitJl E~akution of 11ixInduced Earthquake <br />GEI Consultants, Inc. 27 <br />