Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 07a State :Colorado Permit/job# :M-1983-194 <br />Date <br />User <br />11/05/2008 <br />THM <br />County: Rio Blanco <br />Site :Natural Soda, Inc. <br />Abbreviation :none <br />Filename :M194-07a <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br />volume : 27,612 CCY factor : 1.110 volume : 30,649 LCY <br />Source of estimated volume : Move Approx. 24 20 CY per acre over 11.41 to est. final grade <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-ro <br />- -- Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.82 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.41 <br />Weight description <br />Clay - Natural bed Adjusted unit production : 259.10 LCY/hr <br /> Adjusted fleet production : 518.21 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 59.14 Hours <br />Unit cost : $0.618 /LCY Total job cost : $18,952