My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-02_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2009-02-02_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:19 AM
Creation date
2/10/2009 8:34:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
2/2/2009
Doc Name
Final reclamation cost estimate
From
DRMS
To
Natural Soda, Inc.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> Operating cost/hour : $77.13 100 <br /> Ripper op. cost/hour : .$0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $160.22 Total fleet cost/hour : $320.44 <br /> -------------------- -------- <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 LCY factor : NA volume : 6,453 LCY <br /> <br />Source of estimated volume :6" topsoil over 8 acres <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB)_ <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 _ (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Partly consolidated stockpile Spoil pile : 0.80 _(fnd-rf) <br />-- - Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude :- -d,600 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.79 <br /> <br />Weight description <br />Top Soil Adjusted unit production : 386.80 LCY/hr <br /> Adjusted fleet production : 773.60 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 8.34 Hours <br />Unit cost : $0.414 /LCY Total job cost : $2,673 <br />
The URL can be used to link to this page
Your browser does not support the video tag.