Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 06a State : Colorado Permit/job# : M-1983-194 <br />Date <br />User <br />1110512008 <br />THM <br />County: Rio Blanco <br />Site :Natural Soda, Inc. <br />Abbreviation :none <br />Filename :M194-06a <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br />Operating cost/hour : $77.13 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $160.22 Total fleet cost/hour : $320.44 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 19,682 CCY factor : 1.110 volume : 21,847 LCY <br /> <br />Source of estimated volume :6.2 acres requirine approx 3,226 CY per acre to est. final grade <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Compacted fill or embankment Spoil pile: 0.80 (fnd-rf) <br />----- Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.82 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.37 <br />Weight description <br />Clay - Natural bed Adjusted unit production : 180.84 LCY/hr <br /> Adjusted fleet production : 361.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time : 60.40 Hours <br />Unit cost : $0.886 /LCY Total job cost : $19,356