Laserfiche WebLink
H. Water Resources: <br />There are no water resources within the proposed 110 Limited Impact Permit area. There is a <br />small pond and perennial creek approximately 225', at its closest, down slope from the proposed <br />110 Limited Impact Permit area The work deck is porous and historically absorbed all run-off. <br />Two strategically placed detention ponds will be constructed to collect any sediment so there will <br />be no hydrologic disturbance or off site water damage. See Exhibit E for the detention pond <br />locations.