Exhibit C - Mining Plan <br />1. Mining shall commence immediately and last up to 99 years. <br />2. All salvageable soil will be kept and incorporated into to work deck or used to replace deplete <br />quarry areas for reclamation purposes or put into soil stock pile as shown on map. Soil Stock <br />Pile, if left for more than a 3 month period, will be stabilized with a vegetation cover. <br />3. From 2" to 18" of overburden will be removed to reach the deposit. Once overburden is <br />removed the stone is usable immediately. <br />4. The depth of the deposit is between twenty to sixty feet. <br />5. This is an old existing quarry which was opened in the 1950's to early 1960's. It is known as a <br />pre-law quarry so the existing disturbance was not permitted. This is a long established quarry <br />and the color is used to match buildings at Colorado University in Boulder. This stone is light in <br />color with pink running thought it and golden stripping or spots. <br />6. The stone is quarried by front end loaders, excavators, and hand tools. Processed with hand <br />tools and sorted into flagstone, slabs, and blocks. Remaining material cut into strip-stone on a <br />stone cutter. <br />7. We expect to have 4.77 acres in open mining when fully developed <br />8. No water is to be used in this operation. <br />9. No ground water will be encountered and/or no surface water will be disturbed. <br />10. No water rights are involved in this operation <br />11. No refuse or acid forming or toxic producing materials are involved in this operation. <br />12. No off-site damage will result because the work deck will absorb run-off. <br />13. Stability of site will be obtained by using rocks in the soil replaces and seeding it at an <br />appropriate time of year. <br />14. No tailing ponds, heaps, or vats are involved. <br />15. The primary commodity to be quarried is dimension stone and the secondary commodity to be <br />quarried is flagstone. <br />16. Estimated closure of Quarry and reclamation is December 31, 2107 <br />17. This operation will not be using any explosives. <br />18. No permanent structures will be placed inside the proposed permit area. <br />19. It is not anticipated that there will be periods of 180 days or more that the operation will be <br />inactivity.