Laserfiche WebLink
EXHIBIT "L" <br />Oaklands Ranch Gravel Pit - Phase 4 <br />Reclamation Idems Quanity Unit Unit Cost Total Unit Cost <br />Replace Overburden 170 LCY $1.00 $170.00 <br />Place Topsoil Over Area 1699 LCY $1.00 $1,699.00 <br />Seed Bed Preparation 3.16 Acre $27.00 $85.32 <br />Fertilizer Application 3.16 Acre $28.00 $88.48 <br />Seeding Drilling Method <br />Seed Included <br />(Hay Meadow) 1.37 Acre $150.00 $205.50 <br />(Natural Area) 1.79 Acres $105.00 $187.95 <br />Mulching W/ Hay & Straw 3.16 Acre $165.00 $521.40 <br />Weed Control Allowance 3.16 Acre $25.00 $79.00 <br />Mobilization & <br />Demobilization Each $1,120.00 $1,120.00 <br />Total Direct Cost $4,156.65 <br />Indirect Costs <br />Public Liability Insurance 1.55% <br />Contractor Performance <br />Bond 1.55% <br />Contractor Profit 10.00% <br />Division of Minerals & <br />Geology Adim. Expense 5.00% <br />Additional Supervision 3.00% <br />Total Performance Bond <br />Amount (Phase 4) <br />$64.43 <br />$64.43 <br />$415.67 <br />$207.83 <br />$124.70 <br />$5,033.70