Laserfiche WebLink
EXHIBIT "L" <br />Oaklands Ranch Gravel Pit - Phase 5 <br />Reclamation Idems Quanity Unit Unit Cost Total Unit Cost <br />Replace Overburden 159 LCY $1.00 $159.00 <br />Place Topsoil Over Area 1586 LCY $1.00 $1,586.00 <br />Seed Bed Preparation 2.95 Acre $27.00 $79.65 <br />Fertilizer Application 2.95 Acre $28.00 $82.60 <br />Seeding Drilling Method <br />Seed Included <br />(Hay Meadow) 2.65 Acre $150.00 $397.50 <br />(Natural Area) 0.3 Acres $105.00 $31.50 <br />Mulching W/ Hay & Straw 2.95 Acre $165.00 $486.75 <br />Weed Control Allowance 2.95 Acre $25.00 $73.75 <br />Mobilization & <br />Demobilization Each $1,120.00 $1,120.00 <br />Total Direct Cost $4,016.75 <br />Indirect Costs <br />Public Liability Insurance 1.55% $62.26 <br />Contractor Performance <br />Bond. 1.55% $62.26 <br />Contractor Profit 10.00% $401.68 <br />Division of Minerals & <br />Geology Adim. Expense 5.00% $200.84 <br />Additional Supervision 3.00% $120.50 <br />Total Performance Bond <br />Amount (Phase 5) $4,864.28