Laserfiche WebLink
. EXHIBIT "L" <br />Oaklands Ranch Gravel Pit - Phase 3 <br />Reclamation Idems Quanity Unit Unit Cost Total Unit Cost <br />Replace Overburden 180 LCY $1.00 $180.00 <br />Place Topsoil Over Area 1791 LCY $1.00 $1,791.00 <br />Seed Bed Preparation 3.33 Acre $27.00 $89.91 <br />Fertilizer Application 3.33 Acre $28.00 $93.24 <br />Seeding Drilling Method <br />Seed Included <br />(Hay Meadow) 2.62 Acre $150.00 $393.00 <br />(Natural Area) 0.71 Acres $105.00 $74.55 <br />Mulching W/ Hay & Straw 3.33 Acre $165.00 $549.45 <br />Weed Control Allowance 3.33 Acre $25.00 $83.25 <br />Mobilization & <br />Demobilization Each $1,120.00 $1,120.00 <br />Total Direct Cost $4,374.40 <br />Indirect Costs <br />Public Liability Insurance 1.55% $67.80 <br />Contractor Performance <br />Bond 1.55% $67.80 <br />Contractor Profit 10.00% $437.44 <br />Division of Minerals & <br />Geology Adim. Expense 5.00% $218.72 <br />Additional Supervision 3.00% $131.23 <br />Total Performance Bond <br />Amount (Phase 3) $5,297.40