Laserfiche WebLink
topsoil be replaced. Our experience is that more topsoil salvaged and replaced will <br />provide for a better chance of successful revegetation establishment, lead to a more <br />successful reclamation, and ultimately a quicker final release of the site. Also no <br />information is given as to the size and type of trees that will be replaced in the Stage 1 <br />area to correspond with those shown on the Reclamation Plan Map, please provide this <br />information. <br />6.4.6 EXHIBIT F - Reclamation Plan Map <br />This section is adequate as submitted. <br />6.4.7 EXHIBIT G - Water Information <br />Please specify where the additional monitoring wells described in Section 8.2 will be <br />installed. The Division concurs that regular water level monitoring should be an integral <br />part of the site operations; however, a technical revision may be required for additional <br />monitoring wells if at least general proposed locations are not specified as part of the <br />original application. <br />Please be aware that you will need to commit to not exposing groundwater until the <br />Substitute Supply Plan is approved, or you will be required to post a bond for 100% of <br />the cost to backfill the operation. If the Substitute Supply Plan has been approved by the <br />State Engineer, please provide verifying documentation. <br />6.4.8 EXHIBIT H - Wildlife Information <br />This section is adequate as submitted. <br />6.4.9 EXHIBIT I - Soils Information <br />This section is adequate as submitted. <br />6.4.10 EXHIBIT J - Vegetation Information <br />This section is adequate as submitted. <br />6.4.11 EXHIBIT K - Climate Information <br />This section is adequate as submitted. <br />6.4.12 EXHIBIT L - Reclamation Costs <br />Conceptually the reclamation plan is adequate; however, significantly more detailed <br />information will be required for the reclamation cost breakdown for the site. This <br />information is required so that the existing calculations can be justified for use by DRMS, <br />or so that an accurate calculation of the bond can be completed by DRMS. It is noted