Laserfiche WebLink
CIRCES Cost Estimating Software <br />IPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Task # : 047 State :Colorado Permit/job # :C9~~2~03~ <br />Date :05/30/2008 County :Rouft Abbreviation :none <br />User : JHB Site :Hayden Gulch Load Out Filename :C081-047 <br />Permit or other job action :Rn3 <br />Task description :1!l~®@~/e~em®~a eqa®®~enert't f®r sez~e s~s~a®u~g. ~ ~®a~~ <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 ~ $125.45 <br />tinu_RnennRi F Fni npnn~~T <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P 9.17 $11.29 $88.67 5 $499.80 $443.35 $0.00 <br />-Cat 325C L 31.07 $38.60 $117.55 1 $156.15 $117.55 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $655.95 $560.90 $0.00 <br />RN-03 23-1.34 Revised 06/08 <br />