Laserfiche WebLink
I11 111"IAA C\IT <br />sheet 2 of 2 <br />Machine <br />Description <br />-Generic 8-10 cy, 6x4 Total <br />Cost/hour/unit <br />$66.15 Fleet Size <br />(No. units) <br />6 Haul Trip <br />Cost/hr/fleet <br />$396.89 Return Trip <br />Cost/hr/fleet <br />$396.89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $396.89 $396.89 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />• <br />RN-03 <br />Non- <br />Roadable <br />Equipment <br />0.40 <br />0.40 <br />0.25 <br />0.25 <br />1.30 <br />Nearest major city or town wlthln project area region . Hayden <br />Total one-way travel distance : 10.0 miles <br />Roadable Average travel speed : 25.0 mph <br />Equipment <br />0.40 <br />0.40 <br />NA <br />NA <br />0.80 <br />Total non-roadable mob/demob cost * <br />'two round trips with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />Total job time <br />Total job cost <br />23-1.35 <br />Revised 06/08 <br />