My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_PERMIT FILE - C1992081A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081A
>
2008-12-03_PERMIT FILE - C1992081A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:32 PM
Creation date
2/5/2009 2:00:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/3/2008
Doc Name
Railcar Load-In Operations Bond Estimate Worksheets (Approved TR6, but not Implemented)
Section_Exhibit Name
Tab 23 Attachment 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R!'1AnARl G CnI11PMFNT <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br /> <br /> <br />-Flafbed Truck, 6x4, 45K GVW $65.02 9 $65.02 $65.02 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $65.02 $85.02 <br />sheet 2 of 2 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Hayden <br /> Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 25.0 mph <br /> Equipment Equipment <br /> Haul time (hours) = 0.40 D.40 Total non-roadable mob/demob cost " : $812.95 <br /> Return time (hours) = 0.40 0.40 'two round trips with haul rig <br /> Loading time (hours) = 0.25 NA Total roadable mob/demob cost "" : $52.09 <br /> Unloading time (hours) = 0.25 NA ~• one round trip, no haul rig <br /> Subtotals = 9.30 0.80 <br /> <br /> <br />........... ... <br />............................................................ <br />JOB TIME AND COST .......................... ................................. ................................................................................................ <br /> <br />Total job time : ....... .:.~::::h ..urs <br /> <br />2,~® o <br /> Total job cost : $e~~5 <br /> <br /> RN-03 23-1.33 Revised 06/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.