Laserfiche WebLink
CIRCES Cost Estimating Software <br />MENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Task # : ®4~ State :Colorado Permit/job # : C9~92-®~9 <br />Date :05/30/2008 County :Routt Abbreviation :none <br />User : JHB Site :Hayden Gulch Load Out Filename :C081-046 <br />Permit or other job action :Rn3 <br />Task description :~®~/~~PB'B®~D ~~pQl~~iCB't~V]~' 1~®&'~®9b2111"~~P?®4/~A <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per ay <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51 + Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />ain~~ onAnADI C Cl1IIIDMCNT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br /> <br />-Cat D9R - 9SU (2005) 60.61 $62.35 $125.45 1 $987.80 $125.45 $0.00 <br /> <br /> <br />-Revegefation tractor 20.00 $80.00 $88.67 1 $168.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $356.47 $214.12 $0.00 <br />RN-03 23-1.32 Revised 06/08 <br />