Laserfiche WebLink
CIRCES Cost Estimating Software <br /> <br /> <br /> <br />PROJECT IDENTIFICATION <br />Task # : 244 <br />Date : 11/182005 <br />User : JHB <br />State : Colorado PenniVjob# :C1981-010 <br />County :Moffat Abbreviation :none <br />Site : Trapper Mine Filename :C0f0-244 <br />Agency or organization name :Colorado Division Of Minerals And <br />PermR or otherjob adian :TR-96 <br />Task desuiption :Topsoil Sage #1 & #2 pond <br />................ <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D10R - fOSU Horsepower : 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :IJA <br /> Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown : Ownership cosUhour : $60.00 NA <br /> Operating cosUhour : $124.54 100 <br /> Ripper op. wsUhour : $0.00 NA <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosUhour : $216.32 Total fleet cesUhour : $432.65 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,616 CCY factor : 1.125 volume : 13,068 LCY <br />Source of estimated volume :Table TR94-1 <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 500 feet <br />Unadjusted howdy production : 410.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 3.00 % (neg) <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.658 /LCY <br />Source <br />Operator skill : 1.00 (ex <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (lshif~ <br />Spoil pile : 1.00 (doz <br />Push gradient: 1.07 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.90 (Cat <br />Blade type : 1.00 (S/Si <br />Net correction : 0.80 <br />Adjusted unit production : 328.82 LCY/hr <br />Adjusted fleet production : 657.64 LCY/hr <br />To[al job time : 19.87 Hours <br />Total job cost : $8,597 <br />~ P,wwl .~c <br />