My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> <br /> <br /> <br />PROJECT IDENTIFICATION <br />Task # : 244 <br />Date : 11/182005 <br />User : JHB <br />State : Colorado PenniVjob# :C1981-010 <br />County :Moffat Abbreviation :none <br />Site : Trapper Mine Filename :C0f0-244 <br />Agency or organization name :Colorado Division Of Minerals And <br />PermR or otherjob adian :TR-96 <br />Task desuiption :Topsoil Sage #1 & #2 pond <br />................ <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D10R - fOSU Horsepower : 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :IJA <br /> Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown : Ownership cosUhour : $60.00 NA <br /> Operating cosUhour : $124.54 100 <br /> Ripper op. wsUhour : $0.00 NA <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosUhour : $216.32 Total fleet cesUhour : $432.65 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,616 CCY factor : 1.125 volume : 13,068 LCY <br />Source of estimated volume :Table TR94-1 <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance : 500 feet <br />Unadjusted howdy production : 410.8 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient: 3.00 % (neg) <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cost : $0.658 /LCY <br />Source <br />Operator skill : 1.00 (ex <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av <br />Job efficiency : 0.83 (lshif~ <br />Spoil pile : 1.00 (doz <br />Push gradient: 1.07 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.90 (Cat <br />Blade type : 1.00 (S/Si <br />Net correction : 0.80 <br />Adjusted unit production : 328.82 LCY/hr <br />Adjusted fleet production : 657.64 LCY/hr <br />To[al job time : 19.87 Hours <br />Total job cost : $8,597 <br />~ P,wwl .~c <br />
The URL can be used to link to this page
Your browser does not support the video tag.