My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estirnating Software <br />BULLDOZER WORK <br />_ r:: _. _:.:; .:.::: <br />PROJECT IDENTIFICATION <br />Task # : Y43 State :Colorado Permitlob# : C19B1-010 <br />Date: 11/18/2005 County:Moflat Abbreviation :none <br />User: JHB Site :Trapper Mine Filename:C010.243 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action : TR-96 <br />Task description :topsoil Far East Buzzard <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D10R -10SU Horsepower : 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : (hvnership oosUhour : $80.00 NA <br /> Operating cosfMour : $124.54 100 <br /> Ripper op. cesUhour : $0.00 NA <br /> Operator cost/hour : $31.78 NA <br /> Total and cosUhour $216 32 Total fleet cosUhour $218 32 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 807 CCY factor : 1.125 volume : 908 LCY <br /> <br />Source of estimated volume :Table TR94-1 <br />Source of estimated swell factor :cat <br /> ,,; ., <br />HOURLY PRODUCTION Job Condition Cortectron Factors Source <br />Average push distance : 400 feet <br />Unadjustetl hourly production : 497.3 LCYRu <br />Material consistency description : <br />Average push gradient ; 2.00 % (i <br />Average site altitude : 6,800 feet <br />Material weigh! : 2, 550 Ibs/LCY <br />Weight description : <br />Earth -Dry packed <br />Operator skitt <br />Material consistency ; <br />Dozing method ; <br />Visibility ; <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />1.00 <br />1.00 <br />1-00 <br />1.00 <br />0.83 <br />}, 00 <br />1.05 <br />0.90 (Cat <br />1.00 (S/S, <br />0.78 <br />389.39 ~ <br />LCY/hr <br />Adjusted unit production <br />Adjusted fleet production <br />389.39 LCYmr <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.33 Hours <br />Unit cost : ,80.556 /LCY Total job cost : $504 <br />
The URL can be used to link to this page
Your browser does not support the video tag.