My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimation Software <br />s BULLDOZER WORK <br />~s ,., .: ; <br />..; <br />PROJECT IDENTIFICATION <br />Task # : 242 State :Colorado Permitlob# : C1981-010 <br />Date : 11/182005 County :Moffat Abbreviation :none <br />User : JHB Site :Trapper Mine Filename : C010-242 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action : TR-96 <br />Task description :Topsoil Middle Pyeatt #1, #2 & #.? Ponds <br />HOURLY EQUIPMENT COST <br /> Basic machine :CatD10R-10SU Horsepower: 570 <br /> Blade type :Semi-Universal <br /> Attachment na. 1 : ROPS Cab Shift basis : f per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosUhour : $60.00 NA <br /> Operating cwsUhour : $124.54 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cosUhour: $31.78 NA <br /> Total and cosUhour $216 32 Total fleet costmour $432 85 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 7,582 CCY factor : 1.125 volume : 8,530 LCY <br />Source of estimated volume :Table TR94-i <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION Job Condition Cortectian Factors Source <br /> Operator skill : 1.00 (excL) <br />Average push distance : 400 feet Material consistency : 1.00 (Cat HB, <br />Unadjusted hourly production : 4973 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency desciption : Job efficiency : 0.83 /ishiWda <br />Consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.02 (Cat HB, <br />Average push gradient : 1.00 % (neg) Altitude : 1.00 (Cat HB, <br />Average site attitude : 6,800 feet Material weight : 0.90 (Cat HB; <br /> Blade type : 1.00 (S/SU/U, <br />Material weight : 2,550 Ibs/LCY Net correction : 0.77 <br />Weight description <br />EaRh -Dry packed Adjusted unit production : 380.62 LCY/hr <br /> Adjusted fleet production 781 24 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(sj Total job time : 11.21 Hours <br />Unit cost : $0.568 /LCY Total job cost : $4,848 <br />
The URL can be used to link to this page
Your browser does not support the video tag.