My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />State :Colorado Penn~obi1:C1981-010 <br />County : Moltat Abbreviation :none <br />Sde:TrapperMine Filename:C010-245 <br />Agency or organization name :Colorado Division O/Minerals And <br />Permit or other job action :TR-96 <br />Task description :Topsoil West Horse pond <br />HOURLY EQ UIPMENT COST <br /> Basic machine :Cat D10R- IOSU Horsepower: 570 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br /> Cost Breakdown : Ownership cosUhour : $60.00 NA <br /> Operating cost/hour : $124.54 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cosUhour : $31.78 NA <br /> Total unit cosVhour : $216.32 Total fleet cost/hour : $216.32 <br /> ': ,:: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,420 CCY factor : 1.125 volume : 2,722 LCY <br />Source of estimated volume :Table TR94-i <br />Source of estimated swell factor :Caterpillar Handbook Edition 34 <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourty production <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 3.00 % (r <br />Average site altitude : 7, 800 feet <br /> <br />Material weight <br />Weight description <br />EaRh -Dry packed <br />JOB TIME AND COST <br />Fleet size <br />UnR cost <br />2,550 Ibs/LCY <br />Job CondRion_Correction Factors <br />Operator skill : 1.00 <br />Material consistency : 7.00 <br />Dozing method : 1.00 <br />Visibility : Y.00 <br />Job efficiency : 0.83 <br />SPOiI pile : 1.00 <br />Push gradient : 1.07 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.80 <br />Source <br />Adjusted unit production : 757.21 LCYIhr <br />Adjusted fleet production : 757.21 LCY/hr <br />Total jab time : 3.60 Hours <br />Total job cost : $778 <br />200 feet <br />946.0 LCYRv <br />1 Dozers) <br />$0.286 /LCY <br />> :: <br />/~\ ~J pw.~ i x /?c <br />
The URL can be used to link to this page
Your browser does not support the video tag.