My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br /> <br />PROJECT IDENTIFICATION <br />Task # : 130 <br />Date : 11/16/2005 <br />User : JHB <br />State :Colorado <br />County :Moffat <br />Site :Trapper Mine <br />Pertnitllob# : C1981-010 <br />Abbreviation :none <br />Filename : C010-130 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : TR-96 <br />Task description : Bac~ll G Dip pit <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br /> <br />MATERIAL QUANTITIES <br />Initial <br />volume : 1,576,945 <br />Basic machine :Cat D11 R - 11 SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br /> Utilization % <br />Ownership cosUhour : $71.30 NA <br />Operating cosVhour : $188.40 100 <br />Ripper op. cost/hour : $2.64 15 <br />Operator cosuhour : $31.93 NA <br />Total unit cosvhour : $294.27 Total fleet cost/hour <br />LCV <br />177.08 <br />Swell Loose <br />factor: NA volume: 1,576,945 LCY <br />Source of esdmatetl volume :Appendix A Table f.4-2 <br />Source of estimated swell factor :NA <br /><: <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 191 feet <br />Unadjusted hourly production : 1,564.6 LCY/hr <br />Material consistency description <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />Average push gradient : 5.00 % (~ <br />Average site altitude : 7,000 feet <br />Material weight : 2, 475 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />4 Dozer{s) <br />$0.224 /LCY <br />Operator skill : 1.00 (exi <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av; <br />Job efficiency : 0.81 (2 shin <br />Spoil pile : 1.00 (doz <br />Push gradient : 1.11 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.93 (usi <br />Blade type : 1.00 (S/Sl <br />Ne[ correction : 0.84 <br />Adjusted unit production : 1313.15 LCY/hr <br />Adjusted fleet production : 5,252.82 LCY/hr <br />Total job time : 300.22 Hours <br />Total job cost : $353,384 <br />Horsepower: 850 <br />Shift basis : 2 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.