Laserfiche WebLink
CIRCES Cost Estimatinst Software <br /> <br />~~ <br />PROJECT IDENTIFICATION <br />Task # : 118 <br />Date : 11/162005 <br />User: JHB <br />State :Colorado <br />County :Moffat <br />Site :Trapper Mine <br />Agency or organization name :Colorado Division Of Mine2ls And <br />Permit w other job action : TR-96 <br />Task description :BaC~/l G-test pit <br />HOURLY EQUIPMENT COST <br />Permitlob# : C1981.010 <br />Abbreviation ;none <br />Filename :COf0-118 <br />Basic machine :CatD11R-i1SU Horsepower: 850 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Sh'rfl basis : 2 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> UtAizaBon °h <br />Cost Breakdown : Ownership cost/hour : $71.30 NA <br />Operating costRrour : $188.40 100 <br />Ripper op. cosf/hour : $2.64 15 <br />Operator costfhour : $31.93 NA <br />Total unit cost/hour : $294.27 Total fleet cost/hour : $588.54 <br />MATERIAL QUANTITIES ~ ~ `~` ~< T Y <br />Initial Swell Loose <br />volume : 214,359 LCY factor : NA volume : 214,359 LCY <br /> <br />Source of estimated volume :Appendix A Tabl. 1.4-2 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Source <br /> Operator skill : 1.00 (ex~ <br />Average push distance : 181 feet Material consistency : 1.00 (Cat <br />Unadjusted hourly production : 1,645.9 LCYthr Dozing method : 1.00 (ge <br /> Visibility : f.00 (av <br />Material consistency description : Job efficiency : 0.81 (2 shift <br />Consolidated stockpile Spoil pile : 1.00 (doz <br /> Push gradient : 0.88 (Cat <br />Average push gradient : 6.00 % (pos) Altitude : 1.00 (Cat <br />Average site altitude : 7,000 feet Material weight : 0.93 (us <br /> Blade type : 1.00 (S/SI <br />Material weight : 2,475 Ibs/LCY Net correction : 0.66 <br />Weight description <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 1090.64 LCY/hr <br /> Adjusted fleet production 2,181 27 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(sj Total job time : 98.27 Hours <br />Unit cost : $0.270 /LCY Total job cost : $57, 837 <br />~' 1 <br />