Laserfiche WebLink
<br />CIRCES Cost Estimatinsl Software <br />PROJECT ID ENTIFICATION <br />Task # : 116 State :Colorado PermiVjob# : C1981-010 <br />Date : 11/162005 County : MaHaf Abbreviation :none <br />User: JHB Site ;Trapper Mine Filename:C010-116 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action : TR-96 <br />Task description : Bac~li G-Strike pit <br />HOURLY EQUIPMENT COST <br />Cos! Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume: 1,206,539 CCY <br />Basic machine : Cat D11 R - 11 SU Horsepower : 850 <br />Blade type : Semr-universal <br />Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br />Attachment no. 2 : 1-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cost/hour <br />Total unit cosUhour <br />Swell <br />factor <br />Utilization °h <br />$71.30 NA <br />$188.40 100 <br />$2.64 15 <br />$31.93 NA <br />$294.27 Total fleet cosUhour : $1, <br />Loose <br />1.000 volume : 1,206,539 LCY <br /> <br /> <br /> <br /> <br /> <br />Source of estimated volume :Appendix A Table f.4-2 <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Comedion Factors Source <br />Average push distance : 294 feet <br />Unadjusted hourly produdion : 1,037.8 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 5.00 % (r <br />Average site altitude : 7,000 feet <br />Material weight : 2,475 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.361 /LCY <br />Operator ski!! : 0.85 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.81 -~ <br />Spoil pile : 1.00 <br />Push gradient : 1.11 <br />Altitude : 1.00 <br />Material weight : 0.93 <br />Blade type : 1.00 <br />Net correction : 0.78 <br />Adjusted unit produdion <br />Adjusted fleet produdion <br />814.40 LCY/hr <br />3,257.60 LCY/hr <br />Total job time <br />Total job cost <br />Data source : (CRG) <br />370.38 Hours <br />177.08 <br />~~C <br />