Laserfiche WebLink
CIRCES Cost Estimating Software <br /> <br />State :Colorado Perm~ob# :C1981-010 <br />County :Moffat Abbreviation :none <br />Site :Trapper Mane Filename : C010-131 <br />Agenq or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :TR-96 <br />Task description : G•dip SOUth <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D11 R - 11 SU Horsepower : 850 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 2 per day <br /> Attachment no. 2 : 7-shank ripper <br /> Data source : (CRG) <br /> Utilization °k <br />Cost Breakdown : Ownership cost/hour : $71.30 NA <br /> OperatingcosTmour : $188.40 100 <br /> Ripper op.cosl/hour : $1759 100 <br /> Operator cosUhour : $31.93 NA <br /> Total untt cosUhour $309 22 Total fleet cosUhour $1,236 90 <br />` <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 423,295 LCY factor: NA volume: 423,296 LCY <br /> <br />Source of estimated volume :Appendix A Tabl. 1.4-2 <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Corre ction Factors Source <br />Average push distance : 203 feet <br />Unadjusted hourly production : 1,483.3 LCY/hr <br />Material consistency description <br /> <br />Average push gradient : 6.00 % (~ <br />Average site attitude : 7,000 feet <br />Material weight : 2,475 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />J08 TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.243 /LCY <br />Operator skill : 1.00 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Vsibiliry : 1.00 <br />Job efficiency : 0.81 <br />Spoil pile : 1.00 <br />Push gradient : 1.14 <br />Altitude : 1.00 <br />Material weight : 0.93 <br />Blade type : 1.00 <br />Net correction : 0.86 <br />Adjusted unit production : 1270.06 LCY/hr <br />Adjusted fleet production : 5,080.23 LCY/hr <br />Total job time : 83,32 Hours <br />Totaljobcost: $103,061 <br /> <br />