Laserfiche WebLink
CIRCES Cost Estimatinsr Software <br /> <br /> <br />PROJECT IDENTIFIGATION <br />Task # : 104 State :Colorado PermiVjob# : C-1981-010 <br />Date: 11/16/2005 County:Mo/fat Abbreviation ;none <br />User: JHB Site :Trapper Mine Filename:C010-104 <br />Agency or organization name :Colorado Division Of Minerals 6 Geology <br />Permit or other job action : TR-96 <br />Task description : BeC~II F plt DIDllfle <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 2,146,027 <br />Basic machine : Cat D11 R - 11 SU <br />Blade type : Semr-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 :NA <br /> <br /> Util'aation % <br />Ownership wstlhour : $57.45 NA <br />OperatingcosUhour : $188.40 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $32.03 NA <br />Total unit costRiour : $277,88 Total fleet cosUhour <br />111.53 <br />Swell Loose <br />LCY fador : NA volume : 2,146,027 LCY <br />Source of estimated volume :Appendix A Table 1.4-2 <br />Source of estimated swell fador : NA <br />HOURLY PRODUCTION Job Condition Correction Factors ~ ~ Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 189 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,605.2 LCY/hr Dozing method : 1.15 (used <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.79 (3shrfts /day) <br />Partly consolidated stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.16 (Cat HB) <br />Average push gradient : 7.00 % (nag) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,000 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SUA1J <br />Material weight : 2,475 Ibs/LCY Net correction ; 0.82 <br /> <br />Horsepower.: 850 <br />Shift basis : 3 per day <br />Data source : (CRG) <br /> <br />