Laserfiche WebLink
<br /> <br />CIRCES Cost Estimating Software <br />PgOJECT IDENTIFICATION <br />Task;! : 105 <br />Date : t i/15/2005 <br />User : JHB <br />State :Colorado <br />County : MoNat <br />Site :7rapperMine <br />Permitlob# : C1981.010 <br />Abbreviation :none <br />Filename : COfO-105 <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />Permit or other job action : TR-96 <br />Task description : Bacl~ll Fas! F (Z) pit <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Ceb <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 850 <br />Shift basis : 2 per day <br /> Data source : (CRGj <br /> Utilization <br />Cost Breakdown • Ownership cosUhour : $71.30 NA <br />Operating cost/hour : $188.40 100 <br />Ripper op. coslRrour : $4.40 25 <br />Operator oost/hour : $31.93 NA <br />Total unit cost/hour : $296.03 Total fleet costmour : $1,!84.12 <br />MATERIAL QUANTITIES <br />Initial Swett Loose <br />volume : 735, 713 LCY factor : NA volume : 733, 713 LCY <br />Source of estimated volume :Appendix A Table 1.4-2 <br />Source of estimated swell factor :NA <br />,, <br />HOURLY PRODUCTION ... <br />Job Conddion Correction Factors > <br />Source <br />Average push distance <br />Unadjusted hourly production <br />191 feet <br />1,564.6 LCYihr <br />Material consistency desorption <br />Partly consolidated stockpile <br />Average push gradient <br />Average site attHude <br />7.00 % (r <br />7,000 feet <br />Material weight : 2,475 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.224 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blatle type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.85 <br />1.10 <br />1.15 <br />1,00 <br />0.81 <br />0.90 <br />1.16 <br />1.00 <br />1.00 ~ (S/SI <br />0.84 <br />1321.80 LCY/hr <br />5,287.19 Lcv/hr <br />!39.15 Hours <br />$164,770 <br />