Laserfiche WebLink
CIRCES Cost Estimatintl Software <br /> <br />PROJECT IDENTIFICATION <br />Task # : 103 <br />Date : 01/18/2006 <br />User : JHB <br />State :Colorado Permitlob# : C1981-010 <br />County :Moffat Abbreviation :none <br />Site :Trapper Mine Filename : COf D-103 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 3 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $57,45 NA <br /> Operating cosVhour : $188.40 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosl/hour : $32.03 NA <br /> Total umt cosUhour $277 88 Total fleet cosUhour $1,1 ! 1.53 <br /> <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume: 1,502,932 LCY factor: NA volume: 1,502,932 LCY <br /> <br /> Source of estimated volume :Appendix A, Table 1.4-2 <br /> Source of estimated swell factor :NA <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Opeator skill : 0.75 (avg.) <br /> Average push distance : 367 feet Material consistency : 1.10 (Cat HB) <br /> Unadjusted hourly production : 833.7 LCY/hr Dozing method : 1.15 (user) <br /> Vsibiliry: 1.00 (avg.) <br /> Material consistency description : Job efficiency : 0.79 (3shiffs /day) <br /> Partly consolidated stockpile Spoil pile : 0.90 (ssd-(c) <br /> Push gradient : 1.27 (Cat HB) <br /> Average push gradient : 12.00 46 (neg) Altitude : 1.00 (Cat HB) <br /> Average site altitude : 7,01)0 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S1SU/U) <br /> Material weight : 2,475 Ibs/LCY Net correction : 0.79 <br /> Weight description <br /> USER-PROVIDED WEIGHT DATA Adjusted unit production : 662.26 LCYmr <br /> Adjusted fleet production 2,649 04 LCY/hr <br /> <br /> JOB TIME AND COS7 <br /> Fleet size : 4 Dozers) Total job time : 567.35 Hours <br /> Unit cost : $0.420 lLCY Total job cost : $630, 625 <br />P <br />