My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-07-29_PERMIT FILE - C1981010A (11)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-07-29_PERMIT FILE - C1981010A (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:35:02 PM
Creation date
2/5/2009 11:00:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2008
Section_Exhibit Name
Appendix A Circes Estimatating Forms
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> <br /> <br /> <br />PROJECT IDENTIFICATION <br />Task # : 101 <br />Date : 11/17r2005 <br />User: JHB <br />State : Cobrado <br />County :Moffat <br />Site :Trapper Mine <br />Agency or organization name :Colorado Division Of Minerals 8 Geology <br />Permit or other job action : TR-96 <br />Task description :Bacl~ll Ash Disposal Pit <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 646,733 ~ LCY <br />Basic machine : Cat D1 iR - 11 SU <br />Blade type : SemrUniversa! <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Ownership cost8tour <br />Operating cosUhour <br />Ripper op.cosUhour: <br />Operator cost/hour: <br />Total unit cost/hour : $254.86 Ti <br />Source of estimated volume <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Source <br /> Operator skill : 1.00 /ex <br />Average push distance : 319 feet Material consistency : 1.00 (Cat <br />Unadjusted houriy production : 955.8 LCY/hr Dozing method : 1.00 (ge <br /> Visibility : 1.00 (av <br />Mateda! consistency description : Job efficiency : 0.79 (3shiR: <br />Consolidated stockpile Spoil pile : 1.00 (doz <br /> Push gradient : 1.11 (Cat <br />Average push gradient : 5.00 % (negj Altitude : 1.00 (Cat <br />Average site attitude : 6,800 feet Material weight : 0.93 (us. <br /> Blade type : 1.00 (S/SI <br />Material weight : 2,475 Ibs/LCY Net wrcection : 0.82 <br />Weight description <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 78239 LCYfhr <br /> Adjusted fleet production : 6,259.10 LCY/hr <br /> <br />JOB TIME AND COST ;r <, <br />fleet size : 8 Dozers) Total job time : 103.33 Hours <br />Unit wst : $0.326 lLCY Total job cost : $210,671 <br />Horsepower: 850 <br />Shift basis : 3 per day <br />Data source : (CRG) <br />fleetcostlhour: <br />Swell Loose <br />factor : NA volume : 646, 733 LCY <br />A Table 1.4-2 <br />rHandbook <br />Utilization % <br />$51.01 NA <br />$172.95 100 <br />$0.00 NA <br />$30.90 NA <br />PermiUob#:C-1981-010 <br />Abbreviation :none <br />Filename :COfO-101 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.