Laserfiche WebLink
5 (Form 2- Public) <br />G. Total project area to be disturbed . 7 7 (acres) <br />ff. Describe the equipment to be used for the prospecting operations: <br />1 Drill ria. tick <br />1 p i k - - r» ck --- <br />1? Rubber .t ed back hoe <br />l PiDe rc?Ck t r;; i I t-r <br />l Rnhrat <br />1 Water truck <br />1. Describe and locate any structures to be constructed (i.e. stockpiles, ponds, impoundments): <br />Masi pits will b? constructed to hold water, the mud pit will be 4x4x12 <br />fit. This will be in additin to the drill 1 pad size. <br />)iiii bR,?ea are not in drainaaes_and mud pits will be constructed to <br />.Xntain an)4water. encountered <br />J. Describe anticipated relationship to surface water and groundwater (proximity to streams, penetration of ground <br />water aquifers): <br />IV. OPERATION AND RECLAMATION MEASURES: <br />1. The Board suggests that a photographic record of the pre-prospecting and post-prospecting conditions be kept by the <br />prospector. These photos should be taken from the same location and by the same method to clearly show the pre-prospecting <br />condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond or surety release, the <br />Board may consider the photos as evidence of adequate reclamation, and thus, be able to act more quickly on the request for <br />release. <br />2. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass communities of the <br />area. Color photographs. sufficient to adequately represent the ecology of the site and adequately labeled (including date, <br />orientation and location), may be used in lieu of a written description. Based on the quality of the photographs, the Division <br />may require additional detail. <br />.Surf _ace disturbance has occurred in the exploration area from previous <br />UraniuT?? exploration and drillinq_activities. <br />ve-ge on is sage brush and, grasses <br />` ee-pi c t? ea A & R ?.