Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Mu -ni t-s _Ieiill be excayated 4 feet wide by 4 feet deep and 12 feet long. <br />Minnr refnrbi-shpent of existina roads such as drainage crossings and <br />random hcii1c1 -r r mo I- ?t-cess to some pads through a open field. <br />Any trees removed will be stock dpiled and unused in reclamation. <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity _U______. Average Width _Z4__._ _ (ft) Average Length 4 0 -(ft) <br />B. Drill Holes: Quantity 8 Depth s 0 0 -10 0 Q (ft) Diameter 6 1 4_ {in) <br />C. Mud Pits: Quantity 1g Average Width 4(ft) Average Length 12 (ft) <br />Average Depth 4 (ft) <br />Described proposed underground work, including reopening of old workings, advancement ofadits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Conf, , T? ious drill holes and offsetting ore and mineralized <br />drill holes <br />D. Other Disturbances (please describe): <br />Driving. through open field to access drill pad <br />Tot- aI , di irbance__,QQf- 15 , 596 squared feet. <br />Miel anti nil for drill rig and machinery will be brought in daily on <br />t-suckr Dri 1 soap and bentonite for fluid drillin will be transported <br />in by truck as needed. <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />F. New Road(s): None Length N/A _ (ft) Width N/A _ ___ (ft) <br />Significantly Upgraded Road(s) Length N/A (ft) Width -N/A (ft) <br />Are culverts or other crossings proposed? If so, please describe: