Laserfiche WebLink
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />r he rill hole ads no cut and fill <br />v i 1 ed lon the edge of <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />en the drill holes are d if wet the drill hole will be back <br />fillpd with appromed hole plug. Dry h s will be back filled with <br />jauttings All drill holes will be ,ggjpged with3 feet of cement and 12 <br />inches of top sail- If drill hole is digoctly in bed rock then the cement <br />5. Describe how portals, adits, shads, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Dr._il]?pad- and tracks leading to the drill pads will be scarified and <br />speapd Mid pits will have the ggmgvgd soil pushed back iin and the grade <br />seeded. <br />6. Describe how roads will be reclaimed or returned to their pree-prospecting (or better) condition.: <br />Beds will not be disturbed other than rock removal.