Laserfiche WebLink
Approval Date Permit Action <br />9/25/08 MR-349 - Nitrogen pipeline at Shaft No. 2 <br />10/1/08 TR-113 - Box Canyon North monitoring well installation <br />10/10/08 PR-14 - Methane drainage wells for Longwall Panels E-2 <br />through E-12 <br />(withdrawn <br />11/21/08) TR-112 E-Seam methane drainage wells for Longwall <br />Panels E2 through E-12 <br />12/8/08 TR-114 - Helipad relocation <br />12/11/08 TR-115 - Update sediment control plan <br />1/14/09 MR-350 - Backhauling/disposing washed coal refuse <br />Violations <br />No Notices of Violation have been issued since the last permit renewal. <br />Permit Stipulations <br />Permit C-80-007 has the following four active permit stipulations. The permit has 75 inactive <br />permit stipulations that are listed in Appendix "A" of the Findings document for Permit Revision <br />14. <br />Stipulation No. 2 <br />THE APPLICANT SHALL CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL REPORT OF <br />INFLOWS, DISCHARGES AND CONSUMPTION OF WATER WITHIN THE MINE. THIS REPORT IS TO <br />INCLUDE: A MINE WORKINGS MAP SHOWING THE LOCATION AND QUANTITY OF INFLOWS, A <br />TABLE KEYED TO THE MINE MAP WHICH SHALL CONTAIN THE SOURCE (FAULT, FRACTURES, <br />ETC.), QUANTITY, DURATION, AND QUALITY (PH, ELECTRO-CONDUCTIVITY AND <br />TEMPERATURE, ETC.) OF ALL INFLOWS, A TABLE CONTAINING RECORDS OF WATER <br />DISCHARGED FROM THE MINE, CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE <br />MINE, A MAP SHOWING CURRENT WATER USES, A DISCUSSION OF THE WATER BALANCE <br />WITHIN THE MINE, AND A PROJECTION OF HYDROLOGIC IMPACTS OF MINING IN THE <br />UPCOMING YEAR. THE REPORT SHALL BE SUBMITTED IN THE ANNUAL HYDROLOGY REPORT <br />NO LATER THAN APRIL 30 OF EACH YEAR. <br />STATUS: ACTIVE <br />West Elk Mine Page 5 January 30, 2009 <br />Midterm Review