My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-30_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2009-01-30_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:16 PM
Creation date
1/30/2009 3:17:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
1/30/2009
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. 3 <br />THE OPERATOR SHALL, UPON CLOSURE, INSTALL WATER-TIGHT SEALS WITHIN THE MINE <br />TO PREVENT GRAVITY DISCHARGE. THIS REQUIREMENT MAY BE WAIVED UPON THE <br />DIVISION'S APPROVAL OF A PLAN SUBMITTED BY THE OPERATOR. THIS PLAN SHALL <br />INCLUDE A DEMONSTRATION THAT THE WATER QUALITY OF THE DISCHARGE FROM THE <br />MINE WORKINGS WILL BE OF ACCEPTABLE QUALITY AND WILL REMAIN ACCEPTABLE <br />AFTER MINE CLOSURE. THIS SHALL INCLUDE CHEMICAL ANALYSIS AND A PREDICTIVE <br />MODEL THAT USES OXIDATION AND REDUCTION POTENTIAL TO DETERMINE LONG-TERM <br />WATER QUALITY OF MINE WATERS. ALSO, THE PLAN SHALL INCLUDE THE <br />CONSTRUCTION OF A SUITABLE CHANNEL FOR MINE DISCHARGE. <br />STATUS: FUTURE <br />Stipulation No. 7 <br />THE DIVISION DIRECTS MOUNTAIN COAL COMPANY, PRIOR TO ANY DISTURBANCE AT THE <br />UPPER WASTE SITE, TO INSTALL SEVERAL ELECTRONIC TILT METER TUBES DOWNSLOPE FROM <br />THE TOE OF THE PROPOSED WASTE STRUCTURE. THESE TILT METER INSTALLATIONS SHALL <br />BE INSTALLED AS SPECIFIED IN MCC'S AUGUST 15, 1985 SUBMITTAL. ONE INDICATOR <br />SHALL BE INSTALLED WITHIN 160 FEET OF THE TOE OF THE WASTE PILE CURRENTLY HALF <br />WAY BETWEEN MONUMENTS 51 AND 54. THE SECOND SHALL BE INSTALLED <br />APPROPRIATELY 100 FEET NORTHEAST OF MONUMENT S2,160 FEET NORTH OF THE TOE OF <br />THE WASTE PILE, AS INDICATED ON DRAWING NO. MG-R C-001, INCLUDED IN THE PERMIT <br />REVISION NO.6 APPLICATION. DURING THE INSTALLATION OF THESE TILT METER TUBES, <br />THE OPERATOR SHALL AUGER AND LOG THE SURFICIAL AND BEDROCK STRATIGRAPHY <br />ENCOUNTERED. AUGERING SHALL CONTINUE UNTIL THE OPERATOR HAS ESTABLISHED <br />INTACT BEDROCK OCCURRENCE. IF ANY EVIDENCE OF EXISTING LANDSLIDE DEPOSITS IS <br />ENCOUNTERED, THE OPERATOR SHALL DEFINE THE NATURE AND EXTENT OF THE PRE- <br />EXISTING SLOPE INSTABILITY. IF SUCH LANDSLIDE ACTIVITY IS DISCERNED, THE OPERATOR <br />WILL BE REQUIRED TO APPROPRIATELY RECONFIGURE THE PILE DESIGN, PRIOR TO <br />INITIATION OF ANY CONSTRUCTION ACTIVITY. <br />STATUS: FUTURE. <br />West Elk Mine Page 6 January 30, 2009 <br />Midterm Review
The URL can be used to link to this page
Your browser does not support the video tag.