Laserfiche WebLink
PART II - SUMMARY OF: OPERATIONS, REVISIONS TO PERMIT, <br />VIOLATIONS, STIPULATIONS, VARIANCES, AND BOND <br />Revisions to Permit <br />Table 2, below, summarizes permitting actions for Permit C-80-007 that have occurred since <br />the last permit renewal RN-5, approved February 13, 2007. <br />Table 2 - Permitting actions since last renewal of permit C-80-007 <br />Approval Date Permit Action <br />2/20/07 MR-337 - Exhaust fan on Shaft No. 3 <br />3/26/07 MR-339 - Compressed air supply building <br />3/27/07 MR-338 - Geotechnical drillholes on Deer Creek Shaft <br />pad <br />(withdrawn <br />4/27/07) MR-340 - Box Canyon Road re-alignment <br />4/27/07 MR-341 - Subsidence grid for Longwall Panel E-1 <br />5/4/07 MR-342 - 2007 Annual Operating Plan <br />6/18/07 MR-343 - Methane drainage well No. 25-11.5 <br />8/10/07 TR-108 - Preventative mesasures for Monument Dam <br />9/6/07 MR-344 - HDPE pipeline in Sylvester Gulch Road <br />extension <br />3/21/08 PR-12 - Addition of Dry Fork lease COC-67232 <br />3/31/08 MR-345 - Update maps required by Stipulation 79 <br />6/9/08 TR-111 - E-Seam methane drainage wells for Longwall <br />Panel E-1 (Conceptual Plan) <br />6/9/08 MR-346 - 2008 Annual operating plan for methane <br />drainage wells in B-Seam Panels 16 through 24 <br />7/17/08 MR-347 - Annual operating plan - Panel E-1 methane <br />drainage wells <br />8/5/08 MR-348 - Correction of typographical error on permit <br />page 2.05-168 <br />West Elk Mine Page 4 January 30, 2009 <br />Midterm Review