Laserfiche WebLink
Law acres at $4,150.08 (a total of $285,484.00) to the recalculated permanent <br />program areas ($6,026,360.00) for a total reclamation cost estimate of <br />$6,311,844.00. Therefore the Division proposes to release %871,645.00 for <br />the Pre-Law lands covered in SL-2. <br />5. The revisions to the Permanent Program reclamation cost estimate are <br />summarized as follows: <br />a. Topsoil redistribution in the previous DRMS cost estimate included the <br />Pre-Law areas. In order to determine the permanent program acreage still <br />requiring topsoil redistribution, I took the total disturbed area acreage and <br />subtracted out the Pre-Law area and the acreage in permanent structures. <br />Areas Re uirin Topsoil Redistribution <br />Total Disturbed Acreage 2299.3 <br />Permanent Structures (Ponds, Roads) -140.0 <br />Pre-Law Area -326.5 <br />Total Area Requiring Topsoil Redistribution 1832.8 <br />Areas now included in the reclamation cost estimate <br />Task 34 Shop 5.4 <br />Task 35 Wolf Creek 35.6 <br />Task 36 Road F 8.0 <br />Task 37 Wolf Creek 23.3 <br />Task 38 Wolf Creek 25.2 <br />Task 39 Stripping ahead of Wolf Creek 65.7 <br />Task 40 Stripping ahead of Wolf Creek 14.2 <br />Task 41 Wolf Creek 6.2 <br />Task 42 Shop 6.3 <br />Task 43 Haul Road E 2.1 <br />Task 44 Lower Wolf Creek 51.5 <br />Task 45 Haul Road F 8.4 <br />Task 46 Wadge Pit 24.7 <br />Task 47 Stripping ahead of Wadge 42.1 <br />Task 48 Wadge Pit 4.1 <br />Task 49 Road E5 23.9 <br />Task 50 Road E5 28.8 <br />Task 51 landfill 8.5 <br />Task 52 Road E 1 .4 <br />Task 53 Stripping ahead of Wadge 179.8 <br />Task 54 area around KK 7.7 <br />Task 55 Cow Camp 8.8 <br />Task 56 Cow Camp 31.4 <br />2