My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-29_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2007-11-29_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:54 PM
Creation date
1/29/2009 8:40:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
11/29/2007
Doc Name
Revised Reclamation Cost Estimate
From
Susan Burgmaier
To
Mike Boulay
Type & Sequence
SL2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br />November 29, 2007 Governor <br /> Harris D. Sherman <br /> Executive Director <br />To: Mike Boulay Ronald W. Cattany <br /> Division Director <br />From: Susan Burgmaier Natural Resource Trustee <br />Re: Seneca II Mine (C-1980-005) <br />Full Bond Release on Pre-Law Areas (SL-2) <br />Revised Reclamation Cost Estimate <br />Per your request, I have completed a revised cost estimate for the Seneca II Mine. The <br />cost estimate now reflects full bond release on 257.71 acres of Pre-Law area, and <br />separately assigns liability amounts to the Pre-Law and Permanent Program areas. The <br />total liability for the entire site is now $6,311,844.00. This includes $6,026,360.00 for <br />Permanent Program areas, and $285,484.00 for Pre-Law Areas. To better explain the <br />new cost estimate total, I offer the following: <br />1. The previous reclamation cost estimate was completed for the Phase I bond <br />release (SL-1) which included the Pre-Law areas (326.5 acres) and the <br />Permanent Program lands (1972.8 acres). The cost estimate totaled <br />$7,183,489.00 for 2,299.3 acres of disturbance (approximately <br />$3,124.21/acre). <br />2. Subsequent to the last cost estimate, DBMS and Seneca determined that it <br />would be most appropriate to separate out the Pre-Law areas. The bond held <br />for the Pre-Law areas was $1,355,000.00, based on previously approved <br />permit documents. That bond amount translates to $4,150.08 per acre for <br />backfilling/grading, topsoiling and reseeding the Pre-Law areas. <br />3. Seneca requested a release of $1,183,794.00. To check the requested bond <br />release amount, the Division recalculated the Seneca II cost estimate for the <br />permanent program areas by subtracting the topsoiling and reseeding costs for <br />the 326.5 Pre-Law acres from the Division's cost estimate. The backfilling <br />and grading costs had already been deducted for 259.1 acres in the SL-1 <br />decision. The recalculated permanent program area cost estimate is <br />$6,026,360.00. (Details shown below.) <br />4. To determine the amount of bond release applicable for SL-2, the Division <br />added the cost to backfill/grade, topsoil and reseed the remaining 68.79 Pre- <br />Office of Office of <br />Mined Land Reclamation Denver - Grand Junction - Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.