Laserfiche WebLink
Task 57 Highline Road 16.5 <br />Task 59 EIA 36.7 <br />Task 60 Wadge 18.1 <br />Task 75 Deadhead Routes 25.0 <br />Task 80 Access Roads 20.8 <br />Task 112 Previously reclaimed ("floating bond") and <br />Pre-Law 1103.6 <br />Total 1832.8 <br />Task 112, "Topsoil Redistribution on Previously Disturbed Areas", now <br />excludes Pre-Law areas, resulting in a direct cost decrease of $670,995.00. <br />b. Revegetation costs were similarly adjusted, for a total of 1832.8 acres <br />requiring revegetation, which resulted in a direct cost savings of <br />$268,221.00. <br />c. Since the area requiring topsoil redistribution and revegetation decreased, <br />the hours of job supervision also decreased, resulting in a direct cost <br />savings of $14,427.00. <br />I have attached replacement pages which should be inserted into the existing cost <br />estimate. Should you or the operator have questions or need additional information, <br />please let me know. <br />cc: Sandy Brown w/out attachments <br />3