Laserfiche WebLink
III. COMMENTS - COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during <br /> the inspection. Comments also describe any enforcement actions taken during the inspection and the <br /> facts or evidence supporting the enforcement action <br /> Ponds throughout the mine were snow covered and frozen. The construction of the 6MN pond was close <br /> to completion, but is snow covered. TCC has not begun to fill the reservoir. <br /> The Million Gallon Tank at the PM Bay was not overflowing at the time of the inspection. <br /> Processing Waste: TCC is working the southern portion of RDA (area 3). TCC is end dumping refuse <br /> at the recently topsoil stripped west area of the RDA. TCC personnel stated that they will rip the west <br /> side of the existing refuse pile as they compact the end dumped refuse so that the two areas tie together. <br /> Documents Received: <br /> TCC provided the Division with a Minor Revision application and the 2008 Annual Reclamation Report <br /> at the time of the inspection. <br /> The mine site is in good condition for the weather conditions. No maintenance problems were <br /> identified. <br /> 4 of 6 WHITE-File YELLOW-Operator PINK-Specialist <br />