Laserfiche WebLink
<br />IX. VEHICLE RAUL ROADS <br />CONTROL OPTIONS FOR VEHICLE HAIIL ROADS <br /> <br />(DO NOT WRITE ZN THIS SECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to~manufacturer's specifications) <br />specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />• <br />3. Paving to be completed by <br />14. Gravel <br />(date). <br />(LIST SAIIL ROAD CONTROLS IN THE APPROPRIATE SPACES BELOW) <br />A. TRANSPORT OF RAW MATERIAL FROM REMOVAL BITE TO BTOCRPILE <br />• <br />Distance (oae way) N/A <br />If stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity No. of wheels <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day <br />Haul road silt content (if kaoen) $. <br />List controls for raw materials transport: (see measures listed above) <br />Proposed controls <br />8 <br />