My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1981033
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981033
>
2008-12-04_PERMIT FILE - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:34 PM
Creation date
1/28/2009 10:43:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Section_Exhibit Name
EXHIBIT 04 PERMITS FOR MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />VIII. FINISHED PRODDCT <br />A. LOADING INTO FINIHRED PRODIICT BTOCRPILE <br />Method of loading in (front-end loader, conveyor, etc.) <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: 300 tons/hour _~_ hours/day 235 days/year <br />Proposed controls water soravs as NPPAPA _ <br />Controls for loading to stockpile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />H. FINISRED PRODIICT STOCKPILE <br />(Sized And Unsized Coal) <br />C~ <br />I~ <br />L <br />Maximum tons stored at one time 25,000 tons. <br />Length of time pile remains undisturbed 14 ~a~G <br />Proposed controls: (check appropriate boxes) <br /> <br /> <br />D <br />Watering times/day, or X continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (applied according to manufacturer's <br />specifications). <br />Compacting of piles, method <br />Enclosures: complete, or partial (check oae) <br />Revegetation, (length of time till revegetation ) <br />other (specify) <br />No control <br />C. LOADING OIIT FROM STOCKPILE FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />Reclaim conveyor anA Frnn}- Rnrl 7.n ~.ier <br />If conveyor is used, what is maximum drop height? 20 ft. <br />Loading schedule: 600 tons/hour 16 hours/day 275 days/year <br />Proposed controls Water Sprays as needed <br />Controls for loading out of stockpile include Water injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.