Laserfiche WebLink
<br />D. RESCREENING/CLASSIFYING <br />Maximum tons screened per year <br />Maximum tons screened per hour <br />Hours of rescreening per day _ <br />Proposed controls (see above) <br />VII. CONVEYORS/TRANSFER POINTS <br />_ tons. <br />_ tons. <br />hours. <br />A. <br />• <br />C~ <br />Tons of material conveyed per year 750,000 tons. <br />Tons of material conveYod per day 6,000 tons. <br />Proposed controls Partial enclosure on two conveyors, moist material. <br />Controls for conveyors include: Full enclosure, partial enclosure, no <br />control, other (apeoify) water sprays to maintain surface mositure. <br />(INDICATE OH A SEPARATE DIAGRAM HOW CONDEYOR SYSTEM IS SET IIP) <br />SEE EXHIAIT 2 <br />B. TRANSFER POINTS <br />Number of transfer points 5 <br />Proposed Controls fixed stacking tube, water sprays, partial enclosure 2 cgnveryc <br />Controls for transfer points include: Full enclosure, partial <br />enclosure, water sprays, chemical suppressants, no controls, other <br />(specify) <br />6 <br /> <br />