My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1981033
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981033
>
2008-12-04_PERMIT FILE - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:34 PM
Creation date
1/28/2009 10:43:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Section_Exhibit Name
EXHIBIT 04 PERMITS FOR MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />D. LOADING OOT FROM RAW MATERIAL STOCKPILE: <br />• <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACEB BELOWI <br />A. PRIMARY CRIISHING <br />Method of loadingq out (front-end loader, conveyor, etc.) <br />Front - en3 Loader <br />Loading schedule: 300 tons/hour 8 hours/day 235 days/year <br />Proposed controls for loading to stockpile: moist material, water spray <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specify) as needed <br />VI. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />Yes ^ No (check one) <br />NOTE: ALL PROCESS EQIIIPMENT REQOIREB A BEPARATE PERMIT APPLICATION AND <br />APEN (SEPARATE FORM I8 ATTACHED AT END OF THS FORM - MARE ADDITIONAL <br />COPIES AS NEEDED). <br />Material loaded into processing equipment by: <br />Conveyor Front end loader X Other <br />CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br />moisture Ac if known), water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />Tbis equipment must already be permitted. <br />Maximum tons crushed per year <br />Maximum tons crushed per hour _ <br />Hours of crushing per day <br />Proposed controls (see above) _ _ _ <br />tons. <br />tons. <br />hours. <br />B. <br />Maximum tons screened per year 200,000 tons. <br />Maximum tons screened per hour 300 tons. <br />Hours of screening per day 8 hours. <br />Proposed controls (see above) Moist Material 8 - 108 <br />C. SECONDARY CRUSHING <br />• <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of <br />Proposed <br />crushing per day _ <br />controls (see above) <br />_ tons. <br />_ tons. <br />hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.