Laserfiche WebLink
<br /> <br />~~ <br />• <br />V. RAW MATERIAL <br />A. REMOVAL <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Tons removed per year <br />Maximum tons removed per day 3 <br />Equipment used for removal N <br />Equipment capacity (in tons) N A <br />Est. hours per year required for removal 4,000 <br />Is material drv, moist, or Wet? Moist <br />Specify moisture content if known ($) <br />H. LOADING IN TO RAW MATERIAL STOCKPILE <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />n <br />U <br />Loading schedule: 125 tons/hour 16 hours/day 275 days/year <br />Proposed controls for loading to stockpile: Fixed stacking Tube <br />Controls include: no control, Water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAW MATERIAL STOCKPILE <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time <br />Length of time pile remains undisturbed <br />Proposed controls for rax material stockpile: (check appropriate boxes) <br /> <br /> <br />Watering times/day, or r continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (Type: ). <br />Compacting of piles, method <br />Enclosures: complete, or partial (check oaa) <br />other (apacily) <br />No control <br />4 <br />