Laserfiche WebLink
<br /> <br /> <br /> <br />B. FINISHED PRODIICT TRANSPORT (ON SITE1 <br />1. Haul Trucks <br /> <br />CAPACITY EMPTY <br />WEIGHT NO. OF <br />TRUCKS N0. OF <br />WHEELS NO. OF TRIPS <br />PER/DAY AVG. SPEED <br />ON SITE <br />1. 27 Yds. 31 000 6 18 200 10 mph <br />2. Yds. mph <br />3. Yds. mph <br />4. Yds. mph <br />2. Haul Road Information For Final Transport <br />i <br />On site haul roads distance (one way) 1100 Feet <br />Haul road silt content (if known) $. <br />List controls for final transport: (see control measures) <br />Proposed controls: Water 4 - 5 times oer day to maintain moist <br />surface; Approximately 900' is.paved <br />C. OTHER ROAD8 ON-SITE <br />WHAT IS ROAD LENGTH OF (DISTANCE) <br />USED FOR? ROAD? FROM TO CONTROLS (SEE PAGE 9) <br /> Office Water 2 - 3 times/day <br />1.Mine Access 1700 Feet Portal to maintain moist surfa <br />Miscelenaou Water 2 - 3 times/day <br />2,Site Travel Site Site to maintain moist surfa <br />3. <br /> <br />C~ <br /> <br /> <br />9 <br />