My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (21)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:03:39 PM
Creation date
1/28/2009 10:23:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
1/20/2009
Email Name
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 20 January 2009 <br /> Pg 4/4 <br /> General Mine Plan Compliance (cont): - Most of the X-Pod coal has been removed. <br /> There is just a small reserve remaining to be mined at a later date. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Fish and Wildlife: There were a large number of deer seen in the Taylor draw area. <br /> Air Resource Protection: The haul roads in the East, West and South Taylor Pits were all <br /> dry, despite the snow around the rest of the site. There was some dust on these <br /> roads. The operator was working on getting their water wagon running at the shop <br /> area and it looked like it was started when we were inspecting the Wash Bay Pond. <br /> Excess Spoil: - The current active dump area for the South Taylor Pit is the C-C' <br /> underdrain area of the East Taylor fill. The rock drain for this area has been <br /> completed and is covered with filter fabric. The operator has done some end <br /> dumping in the bottom area of the fill and there are many piles of end dumped spoil <br /> in the area. These piles will be covered as the fill increases in height. The main dump <br /> area is along the west side of the fill where the spoil is being dumped down the west <br /> edge to fill the valley up to the permitted height. The fill has advanced to within <br /> several hundred feet of the crusher bench. Once the pile advances closer to this <br /> bench, the crusher will be relocated. <br /> This completes the 20 January 2009 inspection report for the Colowyo Mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.