Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br /> Colowyo C-1981-019 <br /> 20 January 200 <br /> The following identifies enforcement actions taken during this inspection, the required <br /> abatement and date of abatement for the violation, previous violations still requiring <br /> abatement and the termination of violations cited during previous inspections. <br /> Notice of Violation CV-2008-004 remains outstanding. This violation was issued on 26 <br /> August 2008 for Failure to minimize disturbance to the hydrologic balance in the mine <br /> and associated off-site areas, failure to construct a channel so as to not increase the <br /> potential for downstream flooding and minimize adverse impacts to the hydrologic <br /> balance, failure to construct a permanent diversion to safely pass the peak runoff <br /> from a 10-year storm event, failure to construct a permanent diversion to prevent <br /> additional contribution of suspended solids to stream flow and runoff outside the <br /> permit area, failure to provide adequate pond capacity to contain or treat the runoff <br /> from a 10-year, 24-hour precipitation event, failure to provide a nonclogging <br /> dewatering device on a pond to remove water storage resulting from inflow, failure <br /> to prevent outflow through the pond's emergency spillway during the passage of <br /> runoff resulting from the 10-year, 24-hour precipitation event and failure to provide <br /> adequate freeboard to prevent overtopping of the pond's embankment by sudden <br /> increases in volume. <br /> A proposed penalty was assessed on 24 September 2008. The Division and Colowyo <br /> held assessment conferences on 7 November 2008 and 17 November 2008. The <br /> Division fixed a penalty on15 December 2008. On 18 December 2008 Colowyo <br /> requested a hearing before the Mined Land Reclamation Board to discuss/dispute <br /> the facts of CV-2008-004. The operator paid the civil penalty (put it in escrow) on 5 <br /> January 2009. Colowyo has indicated that it will withdraw its request for a Board <br /> hearing. <br /> Colowyo submitted a Technical Revision on 24 December 2008 to fulfill one of two <br /> outstanding abatement steps. The second outstanding abatement step, the <br /> cleaning of the Prospect Pond, has been extended until 20 February 2009. As the <br /> pond cleaning was almost complete at the time of the inspection, it is anticipated <br /> that there will be no need to further extend the abatement of CV-2008-004. <br /> NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br /> Revised 2/97 <br /> m:\coal\share\forms\8101 <br />