My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
1/20/2009 2:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Memo and Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?. e RN - 5 <br />Bowie No. 1 Mine C-81-038 amtkIlcliklow <br />Task: 000 Site: Bowie No. I Mine Date: 21 Nov 07 User: JRS <br /> <br />Permi <br />t Action: _ oun Delta <br />- --- <br />Description_ _ _ -_ <br />Cost Summary File Name: C- 1981-038 <br />-- <br />Tas Reclamation Task Description Hours Direct Cost <br />074 -Recut Haul Road Ditches 3.59 $502.00 <br />-- <br />075 -Construct 2730' of 3' Ditches 6.21 $8681.00--- <br />076- -Construct-4340' of 12' Ditches 35.96 $5,021.00 <br />_ <br />078 -- <br />-Backfill OVM Pipeline Removal Trench <br />0.97 <br />$1,037.00 <br />079 -Establish Irrigation Ditch at Storage and Loadout 1.71 $239.00 <br />081 -Ri ra Placement 4.04 $15,838.00 <br />085 -Backfill and Regrade Pond 1 <br />3.05 <br />$632.00 <br />086 -Backfill and Re de Pond 2 2.47 .0 <br />087 -Backfill and Regrade Pond 3 2.52 $524.00 <br />088 -Backfill and Regn Pond 4 2.9-1- $605.00 <br />089 -Remove Concrete Pond Dams 10.77 $1,503.00 <br />- - - -- - <br />091 -- <br />-Backfill and Re de Waste Pile Pond <br />2.31 <br />$479.00 <br />092 -Backfill and Regrade Timber Storage Pond 2.83 $586 00 <br />093 -Backfill and Regrade Coal Stockpile Pond 1.00 $208.00 <br />095 -Backfill and Regrade Pond W- 1 2.88 $597.00 <br />096 -Backfill and Regzrade Pond W-2 2.88 $597.00 <br /> <br />100 --------- - <br />-Replace Topsoil from Stockpile to Waste Disposal Area <br />4.89 <br />$5,256.00- <br />101 -Move Fill Topsoil Pile into Stockpiled Area 25.75 $27,674.00 <br />102 -Replace Topsoil from Stockpile to OVWM 47.66 $51,211.00 <br />103 -Replace Topsoil from Stockpile to Replaced Fill 11.49 $12,349.00 <br />104 -Replace Topsoil from Stockpile to OV WM Vent Shaft Access 2.84 $3,055.00 <br />105 -Haul Stevens Gulch Topsoil to OVM 5.94 $10,167.00 <br />106 -Redistribute Topsoil at Truck Dump Station 0.44 $478.00 <br />107 -Replace Topsoil from Stockpile to OVM Main Diversion Ditch_ 0.44 $550.00 <br />108 -Replace Topsoil from Stockpile to Remaining Mine Site 12.71 $20,008.00 <br />109 -Replace Topsoil from OVWM Slide Area 0.30 $324.00 <br />110 -Replace Topsoil from Stockpile to TR-38 Drill Pad 0.09 $95...001.----. <br />111 -Replace Topsoil from Stockpile to TR-38 Light Use Road 0.81 - <br />112 -Replace Topsoil from Stockpile to Pond W- 1 1.55 $321.00 <br />1 13 -Replace Topsoil from Stockpile to Pond W-2 1.55 $321.0 <br />118 -Seal OWM and OVWM Vent Shafts 120.00 $59,057.00 <br />125 -Plug and Seal All Boreholes 105.00 $35,559.00 <br />130 -Revegetate OVM 20.00 $33,701.00 <br />131 -Revegetate OV W M 24.44 $41,182.00 <br />132 -Revegetate Remainder of Mine Site 82.28 $58,870.00 <br />133 -Revegetate Narrowed Haul Road Outslope 6.76 $11,391-00 <br />137 -Demolish and Remove All Structures 400.00 $293,402.00 <br />146 -Mobilize lDemobilize Equipment for Initial Reclamation 12.29 $44,266.00 <br />147 -MobilizelDemobilize Equipment for Pond Cleaning 6.00 $2,422.00 <br />148 -MobilizelDemobilize Equipment for Pond Removal 6.00 $3,026.00 <br />149 -Mobil izelDemobilize Equipment for Site Maintenance 24.00 $43,001.00 <br />Summary Sheet Page 2 or 3
The URL can be used to link to this page
Your browser does not support the video tag.