My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
1/20/2009 2:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Memo and Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,: RN 5 <br />•r Bowie No. 1 Mine C-81-038 <br />Task: 000 Site. Bowie No. I Mine Date: 21 Nov 07 User: JRS <br />- - -- <br />Permit Action: <br />-- <br />NOW 1. Be Rtv "j <br /> <br />Cost Summar <br />County <br />File Name: Delta <br /> <br />C-1981-038 <br />Description: y <br />- <br />- ---- <br />Task - <br />Reclamation Task Descriatioa <br />Hours Direct C <br />153 -Proctor Testing Backflled Material 20.00 $702.00 <br />- - ------ - <br />154 Backfll <br />-Nuclear Density Testing <br />40.00 <br />$25,302.00 <br />155 _ <br />-Water Truck for Backfll Moisture Augmentation 450.00 $40,751.00 <br /> <br />158 - <br />-Yearly Site Maintenance and Pond Cleaning <br />240.00 <br />$370,550.00 <br />201 Seal Loadout Wes 12.00 <br />202 Demolish and Remove Structures at Loadout 175.00 S703,538.00 <br /> Task 203 Combined with Task 202 During SL-03 and RN-05 <br />204 Haul Footprints of Loadout Stockpiles to Refuse Area 4.60 $7,814.00 <br />205 Rip Coal Storage/Loa out Area 0.44 <br />----- - <br />206 <br />Excavation/Grading at Storage Area and Loadout <br />- - <br />34.33 <br />36,889.00 <br />_ _ <br />207 _ <br />pur <br />Grade Railroad S 50.42 $54'182.00 <br />--- <br />- <br />208 _ <br />Finish Grade Railroad Spur <br />19.52 <br />$2,268.00 <br />_--- <br />_ <br />209 <br />Replace Topsoil from Stockpile to Truck Dump Station <br />059 <br />$639.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas __8000_ $41±033.00 <br /> <br />211 ---- <br />Remove-Coal Stockpile Pon <br />- <br /> <br /> <br />4 <br />8 <br /> <br />_ <br />- - -- " <br />$1,814.00 <br />.00 <br />212 Remove Train Loadout Pond . -- - <br />- - <br /> - --- - <br />$3,362,588.00 <br /> Total Indirect Costs - - - - - - <br /> .LiabilityInsurance (I.55%) $5_2.,120,11 1- <br />$35,307.17 <br /> <br />_ Performance Bond (1.05%) -- <br />$336,258.80 <br /> Profit (10%) <br />Job Superintendant (1,200 hours @ $41.25/hour <br />_. ,665_ 78 <br />$49,500.0-0- <br />_--- <br />--... $3,835,774.09 <br /> Total Total Contract <br /> $163,020.40 <br /> Engineering Fees (4.25%) $124,662.66 <br /> Administrative Costs (3.25%) - <br /> $4,123,457.1 <br /> Total Liability <br />Summary Sheet Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.