My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-03_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
1/20/2009 2:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Memo and Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br />SCANNED <br />RN - S <br />Bowie No. 1 Mine C-81-038 <br />Task: 000 Site: Bowie No. 1 Mine Date: 21 Nov 07 User: JRS awihw- 4.0 . KIN - - County Delta <br />PQAj ermit Action: File Name: C-1981-038 <br />- <br />Description_ . Cost Summary <br />Reclamation Task Description Hours Direct Cost- <br />Task - <br />001 -Push Fill from Zone 1-A to Zone 4-A at C&S Bench 197.83 $212,587.00 <br />002 -Push Fill from Substation Zone 1-D to Road Cut Zone 2-13 0.35 $377.00 <br />003 -Push Fill from Substation Zone I-D to Road Cut Zone 2-E 0.63 $678.00 <br />004 _. -Push Fill from Outslope Zone 2-B to Portal Zone 4-C 0.10 $107.00 <br />005 -Push Fill from Zone l-C to Water Tank Bench Zone 3-C 83.04 $89,288.00 <br />006 -Push Fill from Highwall Zone 4-D to Portal Zone 4-C <br />Hi 2.74 $2,939.00 <br /> <br />007 p <br />-Push Fill from East Highwall Zone 4-13 to West Zone 4-13 <br />1.93 <br />$2,071.00 <br /> <br />OOg - <br />-Haul Fill from C&S Zone 1-A to Portal Zone 4- <br />121.03 <br />$209,351.00 <br />009 -Haul Fill from Storage Zone 1 -B to Road Cut Zone 2- 0.83 $1,035.00 <br />--- - <br />010 <br />-Haul Fill from Storage Zone I-B to Portal Zone 4- <br />7.71 10.00 <br />$13, 41 <br />- <br />011 <br />-Haul Fill from ROM Area to Portal Zone 4-C <br />25.81 <br />$44,156.00 <br />012 -Haul Fill from ROM Area to Diversion Zones 3-A, 3-B an d 3-C 284.28 $484,091.00 <br /> <br />013 -- <br />-Haul Fill from Storage Zone 1-B to Warehouse Zone - <br />49.50 <br />$37,__97-1.00 <br />014 -Haul Fill from Storage Zone 1-B to Coal one - 31.49 $24,152.0 <br />015 Haul Fill from Zone I -E to Zone 2-13 0.34 _ <br /> <br />016 - - <br />Haul Fill from Zone 1-D to Zone 4- <br />322 <br />$2,470100 <br />017 -Backfill Orchard Valley West Mine 24.09 $25,888.00 <br />- --- --- - -- <br />019 <br />- -Regrade TR 38 Drill Pad <br />1.14 <br />$305.00 <br />025 -Place Four Feet of Cover Material on Waste Disposal _rea 6.40 $6,877.00 <br />026 -Remove Temporary Waste Pile to Waste Disposal Area 2.61 $3,662.00 <br />027 -Haul Footprint of Coal and Mine Stockpiles_ to Refuse Area 5.68 $7,012.00 <br />-- - <br />032 <br />-Compact Waste Pile <br />92.54 <br />$12,341.00 <br />- - <br />033 <br />-Compact OVWM Road Backfll <br />2534 <br />$3,379.00 <br />034 __ -Compact Zones 2-A, C, D and E; 3-A, B and C; 4-A, B and C 434.52 $57,946.00 <br />038 -Rip Cut Zones I-A, B, C, D and E, 2-B; 4- 27.72 $23,881.00 <br />041 -Rip Roads 0.12 1057 <br /> <br />045 _ <br />-Remove Gravel on Roads to Ponds 3 and 4 2.19 $1,678.00 <br />- - - -- <br />-..._ <br />049 <br />-Re de OVWM Light Access Road 4.38 $612.00 <br />- <br />050 -Regrade Timber Storage Access Road 8.36 $1,168.00 <br />052 -Regrade Old Waste Disposal Road 8.36 $1,168.00 <br />053 -Regrade West Ridge Disposal Area 4.18 $584.00 <br />054 -Finish Grade Lower Waste Disposal Road 0.08 $9.00 <br />055 -Rip Outer 22'of Asphalt Haul Road 0.10 $84.00 <br />056 -Haul Asphalt from Haul Road to Portal Bench Zone 4-C 1.90 $3,000.00 <br />057 -Rip Outslope of Haul Road 0.22 $193.00 <br />058 -Excavate Haul Road Outslope and Place at Toe 19.49 $2,721'00 <br />059 -Regrade, TR-38 Light Use Road 2.62 $2,813.00 <br />063 -Finish Grade All Reclamation Zones (1-4) 23.78 $2,763.00 <br />064 -Finish Grade Upper Waste Disposal Road 0.22 $25.00 <br />065 -Finish Grade Crushing and Screening Road 0.08 $9.00 <br />066 -Finish Grade OVWM 2.10 $244.00 <br />068 -Finish Grade Waste Disposal Area 6.15 $715.00 <br />069 -Finish Grade ROM Storage Area 4.61 $536.00 <br />Summary 5neet rage i or j
The URL can be used to link to this page
Your browser does not support the video tag.